双语推荐:引桥

结合佛开高速公路北江大桥北引桥7跨连续梁和南引桥6跨连续梁的顶升改造工程,介绍了以解联后的桥型、内力和变形为解联较优方案的三要素,针对南北引桥分别提出4种解联方案,进行了此三要素的对比分析,确定了最优方案并给出了解联具体施工过程,为今后类似工程提供参考。
Combining with the project for lifting and reconstructing the seven span continuous bridge of the north ap -proach and six span continuous bridge of the south approach in Beijiang Bridge of Fokai Expess Highway ,the bridge style ,internal force and deformation are introduced as the three factors for choosing the better contact-removing scheme of the bridge .At the same time ,four schemes are put forward to the north and south approach bridge respectively ,and the compares and analyses are made for the three factors .In the end ,the better scheme and construction process about the cantact-removing of the bridge are given so as to provide references for the similar projects in the future .

[ 可能符合您检索需要的词汇 ]

利用MIDAS/Civil有限元分析软件反应谱分析法,对大型原油码头钢拱引桥进行自振模态与相应频率进行分析。得出引桥自振模态主要分五大类,对五类阵型的自振频率进行线性回归分析,得出了振型自振频率与振型半波数的对应关系。
Using the response spectrum analysis method to analyze the classification of natural vibration mode and distribution of natural vibration frequency of the steel arch access bridge in crude oil terminal. The natural vibration mode can be divided into five modes. Studied and concluded the linear correlation of frequency and half wave number of vibration mode.

[ 可能符合您检索需要的词汇 ]

佛开高速公路北江大桥采用主桥拆除重建、引桥顶升加固的改造方案。由于引桥连续工字梁存在结构性病害,顶升对梁体的影响需进行评估。同时,顶升误差将导致梁体产生次应力,可能导致梁体出现新的损伤,此外,顶升过程中连续工字梁的结构体系多次发生转换,多次体系转换后梁体的受力性能是否满足要求需进行分析。对北江大桥引桥连续工字梁的典型联跨改造前后的受力性能进行分析,得到其受力性能的变化规律,为桥梁改造施工提供理论依据。
Demolition and reconstruction have been implemented for the main bridge of Beijiang Bridge, jacking and reinforcing method have been designed for the approach bridges. Due to existing structural disease of the continuous I-beams, the effect of lifting to the beams has to be evaluated. At the same time, lifting error may lead to secondary stress of the beams, which may cause new damages; in addition, as many conversions of the continuous beams have occurred during the jacking process, it has to be analyzed that if the stress properties of the beams could meet the requirements after several times of system conversions. By studying on stress properties before and after the reinforcing of the typical combination of continuous I-beams of Beijiang Bridge, the change law of the stress properties has been obtained, which will provide theoretical basis for the bridge construction.

[ 可能符合您检索需要的词汇 ]

将军渡黄河特大桥是我国第一座按30 t轴重设计、施工的重载铁路桥梁,其主桥为钢桁梁,堤内引桥为现浇箱梁结构。本文结合桥址处水文地质情况、现场施工条件选择主桥与引桥的施工方案,并阐述了施工质量控制要点,为后续同类型重载铁路桥梁施工积累了经验。
T he Jiangjundu Yellow River super-long bridge,designed and built for the first time based on 30 t axle load,is applied to the heavy haul railway in China. The main bridge is a steel truss while the approach bridges use box girders cast in place. T he construction scheme was determined according to the hydrogeological condition at the bridge location and on-site construction condition. T he key to construction controlling was demonstrated, accumulating experience for the future similar bridges on the heavy haul railway.

[ 可能符合您检索需要的词汇 ]

以实际工程为背景,介绍哈大铁路普兰店海湾特大桥主桥简支箱梁节段湿接法施工方法,南京长江四桥北引桥划子河以南引桥箱梁节段胶接法施工方法,并对2种施工工艺流程进行总结,分别从施工周期、外观、经济性和实用性方面对2种施工方法进行比较。
Taking a practical engineering proj ect as reference,wet connection construction method of simply supported box beam segmental of Pulandian Gulf large Bridge in Harbin-Dalian railway is in-troduced,and the Huazi River south terminal bridge box beam segmental cementing construction method of the north bridge approach in the 4th Nanjing Changjiang River Bridge is also introduced. The two kinds of construction process are summed up and compared from the aspects of construction period,appearance,economy and practicability,and provides experience for the similar bridge con-struction.

[ 可能符合您检索需要的词汇 ]

化工码头发生严重海损,属小概率事件,但后果严重.针对天原化工码头引桥严重海损,采取抢修和加固两步走的修复方案,先在受损引桥结构边缘补打大直径钢管桩、安装特殊钢牛腿支撑不稳定结构,解决了码头临时生产作业问题,然后进行加固,同时满足结构耐久性的要求,为类似工程抢修起提供借鉴.
Though serious average accident in chemical terminal is a small-probability event, it will cause serious consequences, and there is no relevant experience. Based on the average accidents in Tianyuan chemical terminal approach bridge, this article describes the key driving technology of the steel pipe pile beside the damaged approach structure and supporting unstable structure by special steel corbel to implement not only emergency repair of the approach but also permanent restoration. The technology may serve as reference for emergency repair in similar projects.

[ 可能符合您检索需要的词汇 ]

以一座主跨908 m 的多塔斜拉桥为研究背景,建立全桥动力计算模型,分析了行波效应下该结构常规体系与减隔震体系的地震响应,结果表明:①对于常规体系,行波效应会增大上桥塔内力,但采用拉索减震支座的减隔震体系具有较好的减震率;②考虑行波效应对桥墩抗震有利,而减隔震体系会进一步降低桥墩内力;③减隔震体系可以将主桥支座位移控制在要求范围内,对于引桥,考虑行波效应时,支座位移增大明显,也建议采用拉索减震支座;④行波效应下,主-引桥相对位移增大,建议在主-引桥间设置连梁装置和缓冲装置,以提高抗震性能。
A nonlinear three-dimensional finite element model was established for a multi-pylon cable-stayed bridge.Seismic response analyses of the bridge under excitations considering the travelling wave effect were conducted for both the Conventional System (CS)and the Seismic Isolation System (SIS).The results show that:(1 )For the CS,the traveling wave effect can significantly increase the internal force of upper tower bot-tom;but the SIS that uses the CSFAB has a decreasing amplitude ratio;(2)Sesismic responses of the pier decrease at the loading cases considering the traveling wave effect and the SIS can further reduce the pier forces;(3)Bearing displacement of the approach span increases obviously under traveling wave effect;there-fore,the CSFAB is recommned to be adopted;(4)The relative displacement between the main spane and ap-proach span was further enlarged under the traveling wave effect.Therefore,it is suggested that restrain de-vices and bumper devices should be set up at this pla
以鄂东长江公路大桥南引桥为例,通过对城区桥梁上部结构的比选分析,介绍了30 m 装配式小箱梁的设计思想与计算方法、主要施工流程与关键工艺。
Based on The South Approach of Edong River Highway Bridge,this paper described the comparison analysis about superstructure of city bridge and introduced the design and calculation method,the main construction process and key technology of a 30 meters fabricated small box-girder.

[ 可能符合您检索需要的词汇 ]

沱江一桥复线桥北引桥为双幅分离式连续梁,周边环境和地形条件复杂。利用桥位处原沱江一桥及房建工程的建筑结构,因势利导,降低施工影响,方便进行现浇施工。
The north approach bridge of Tuojiang first bridge with complex line is double separate continuous beam, which has complex peripheral environment and terrain conditions. By using the original Tuojiang bridge and the construction structu-re of housing project, and the favorable terrain to reduce the construction effect, and carries on the cast-in-situ construction conveniently.

[ 可能符合您检索需要的词汇 ]

结合某预应力混凝土斜拉桥施工实例,重点探讨了引桥合龙施工环节,对合龙段的施工顺序、每个施工过程的关键技术问题展开探讨,同时结合实践经验提出工程实施方案,为同类桥梁合龙段的施工提供实例参考。
Combined with the construction practice of a prestressed concrete cable-stayed bridge,this pa-per focuses on the construction of approach span closure, and discusses the key technical problems of the closure segments construction sequence and each construction process. Combined with the practical expe-rience, the paper proposes the construction scheme, so as to provide reference for similar bridge closure construction.